[1]
В. С. Бойко, Б. М. Міщук, and Т. С. Веклин, “TIME MATCHING OF WORK OF OIL POOL AND WELL UNDER A GAS-LIFT FLOWING DURING WELL PLANNING AND OPERATION”, Number, no. 1(13), pp. 230–236, Mar. 2019.